National Grid

Aquidneck Island Reliability Project – “OnIsland”
OnIsland

Through its Aquidneck Island Reliability Project, better known as “OnIsland,” National Grid is investing an estimated $93 million to improve the electrical infrastructure on Aquidneck Island, Rhode Island. This project will minimize disruptions in service delivery and better serve the Island in the future. The work, which spans the Island’s three communities of Newport, Middletown and Portsmouth, began in the summer of 2015 and will conclude in the spring of 2020, pending required project approvals and permitting. The need for the project is driven by the combination of an aging electrical system infrastructure and the increasingly wired lives we all lead. Electricity usage per person has more than doubled since the 1970s. The project calls for the construction of two new substations, a rebuild of an existing substation and the retirement of five substations. National Grid will also rebuild and convert two transmission lines from 69 kilovolts to 115 kilovolts and make improvements to the distribution system. Upgrading the grid to handle the evolving demand for power is a necessity, especially in a densely populated area such as Aquidneck Island. Simply put, the Island’s power needs are increasing on an old system that is at its maximum capacity.



Related Information

Rhode Island Public Utilities Commission Docket Number: SB-2016-01


Website: www.onislandngrid.com/


Stakeholder Relations Lead: Erin Gryniak


Project Email: onisland@nationalgrid.com


Project Hotline:
401-400-5862 or
800-568-4558


Project Twitter Feed: @OnIslandNG