National Grid
Expedited Application Process

The information contained or referred to herein is for reference purposes only, and shall not be relied upon for any purposes. The user of this webpage should independently verify all information before proceeding forward with any project.

If you have not already visited it, please refer to the Pre-Application Process page before proceeding.

In order to submit a successful Expedited Process Interconnection Application (IA) to interconnect a distributed generation (DG) system, please complete the following steps in order:
  1. If the customer is in need of a new electrical service (e.g. there is no existing electric account at the proposed project location) or upgraded electrical service (e.g. proposing to install a 200kW DG system behind an existing residential meter), request it before proceeding! New customers are not required to send a copy of a recent electric bill, but they must provide a Work Request number and pending Account Number on the IA form. (Please contact customer service at 1-800-322-3223 to create the Work Request Number and to receive the Pending Account Number. More information can be found on the Apply for Service page. )

    Note 1: Any new or upgraded service that is requested for an account with a pending IA will be put on hold until the Interconnecting Customer signs an Interconnection Service Agreement.

  2. Prepare the Interconnecting Customer’s IA materials (and have these materials initialed and signed by the appropriate parties).
    1. Exhibit C– Expedited/Standard Interconnection Application (IA) form
    2. Legal Information Document
    3. Schedule Z– Information Required for Net Metering Service form
    4. Exhibit I - Landowner Consent Agreement
    5. IA fee check made payable to National Grid
      1. $4.50 per kW(AC) – Minimum $300 / Maximum: $7,500
      2. Scan a copy of the check before mailing it!

    Note 2: In the Expedited Process, the Exhibit H should NOT be submitted with the other IA materials; it will be provided by National Grid as part of the Interconnection Service Agreement. However, contact information for the named responsible party on the host retail electric billing account (also known as the “Host Customer” or “Retail Customer”) should be provided in the IA form and the Legal Information Document.

  3. Submit all of the Interconnecting Customer’s IA materials and proposed design diagrams (refer to the Pre-Application Process page if necessary).
    1. Email the following materials to National Grid at Distributed.Generation@nationalgrid.com:
      1. Copy of any Pre-Application Reports related to the application provided by National Grid (if applicable)
      2. P.E.-stamped One-Line Diagram (and Three-Line Diagram if applicable)
      3. Site Plan
      4. Technical Specifications (pdf files only)
      5. Exhibit C (IA Form)
      6. Legal Information Document
      7. Schedule Z
      8. Exhibit I (if applicable)
      9. Copy of IA fee check
      10. Any other information pertinent to the application (if applicable)
    2. Mail the IA fee check and the first two pages of the signed IA form to:

      National Grid
      Attn: Distributed Generation
      40 Sylvan Rd
      Waltham, MA 02451
  4. Once the IA materials are received at National Grid, a representative of National Grid’s Distributed Generation Services (DGS) group will communicate with the contacts listed on the IA form and Legal Information Document about the status of the application.
    1. Once all the initial documents (see above) are received and approved, the application is considered complete (application not project).
    2. Complete applications are forwarded to a Technical Support Consultant (in the Technical Sales & Engineering Support department – part of the DGS group) to perform a technical screening review. (Visit the Screening Process page to view the next step of the process.)
Please refer to the Interconnection Documents webpage for a list of all relevant interconnection process documents.

Please refer to the Interconnection Process webpage for a high-level overview of the distributed generation (DG) interconnection process.

Contact E-mail: Distributed.Generation@nationalgrid.com

DISCLAIMER: All content and information provided on this ‘process’ webpage, including links to other National Grid webpages or documents and all of the content and information provided therein, is solely to provide customers, contractors, and other parties with additional useful guidance regarding National Grid’s typical distributed generation interconnection process and matters related thereto. In all instances, the content and information provided by National Grid is superseded by the applicable laws, rules, regulations, tariffs, and regulatory decisions governing the distributed generation interconnection process and all matters related thereto in the relevant jurisdictions, all as may be amended from time to time. The content and information contained herein is not intended to be all inclusive of every process or action available to users with respect to the interconnection of distributed generation. It is the sole responsibility of users of this website to independently verify the process to interconnect its distributed generation, as well as the status of any changes, pending changes, or updates to the process described herein. National Grid shall not be held liable under any circumstances for any errors, omissions, inaccurate, and/or out-dated content or information provided herein. /